All Research
Topics
Data Center Contractor Selection Scripted InterviewData center facilities call for specific industrial design and engineering requirements to meet needs for fire-protection, power provisioning, stand-by power, cooling,... |
|
Data Center Contractor Scripted Interview ScorecardWhen meeting with potential contractors for the build of a new data center, organizations should use a scripted interview to aid in the decision making process. Each... |
|
Data Center Contractor Reference Check ChecklistBuilding a data center is a complex and expensive project that requires the assistance of contractors, especially in the design and planning stages. Selecting the right... |
|
Data Center Site Selection and Security ChecklistWhether it is an existing building or a new construction site, IT must cover due diligence by completing a site evaluation for each potential location. Use a building site... |
|
Data Center Fire Protection and Suppression Selection GuideSelecting fire protection and suppression systems for the data center requires an understanding of the decision points and options available. Although largely regulated by... |
|
Data Center Fire Protection and Suppression Vendor Criteria ChecklistWhile preliminary decisions can be made by IT, the final decision and selection process should be done by consulting a fire engineer. However, not all fire engineers are... |
|
The Quest for Canada's Smartest IT Seeks to Educate Canada's IT Leaders on Cloud ComputingFebruary 19th, 2010 – In an effort to educate and knowledge share with Canadian IT workers, The Quest for Canada’s Smartest IT is hosting a series of highly informative... |
|
NetworkWorld - SAS and Accenture form predictive analytics group(19-Feb-10) SAS Institute Inc. and Accenture Plc. are teaming up to form the Accenture SAS Analytics Group, a joint venture that will develop, implement and manage... |
|
Data Center Power and Cooling Requirements CalculatorIncluding both current and future facility requirements helps to align costs and capacity with enterprise needs. Calculate power, cooling, and standby power requirements to... |
|
Storyboard: Build a Data CenterMany IT departments lack internal expertise to undertake a data center build project as facilities require specific industrial design and engineering requirements to meet... |
|