Data Center Power and Cooling Requirements Calculator

Author(s): Melanie Davy

Upfront estimations are necessary to capture current and future business needs, develop a high-level budget, and align facility costs and capacity with the needs of the enterprise.

Use this tool before to correctly estimate both current and future:

  • Power requirements
  • Cooling requirements
  • Standby power requirements

By gathering and understanding this information, IT can avoid cost overruns and capacity issues during construction.